Ion Exchange Demineralization Systems
All products
Pretreatment

Ion Exchange Demineralization Systems

Combined filtration and dosing trains engineered as a single pretreatment stage

Overview

For projects that require several pretreatment functions working together, JIE NENG engineers integrated skid trains that combine multi-media or softening vessel banks with chemical dosing pumps and interconnecting piping into a single coordinated pretreatment stage.

This approach reduces the number of separately piped equipment items on site and allows the dosing, filtration and monitoring points to be commissioned as one system rather than several independent units.

Integrated pretreatment trains are specified when raw water quality requires more than one treatment step — such as coagulant dosing combined with multi-media filtration — before water proceeds to RO, UF or EDI stages.

JIE NENG cation and anion exchange demineralization system
Ion exchange equipment supplied by JIE NENG

Key Features

  • Combined filtration vessel bank with integrated dosing pumps
  • Coordinated piping and monitoring across pretreatment steps
  • Reduced field piping compared to separately sourced units
  • Configurable vessel and dosing point count per project
  • Positioned ahead of RO, UF or EDI polishing stages

Typical Applications

  • Complex raw water requiring multiple pretreatment steps
  • Coordinated dosing and filtration ahead of RO/UF trains
  • Retrofits consolidating multiple pretreatment stages
  • Industrial sites with variable raw water quality

Discuss your project with our engineering team

Share your feedwater analysis, required throughput and application, and we will follow up with a configuration tailored to your project.